
Frequently Asked Questions & Answers
Bright Bay’s longevity and sterling reputation is the direct result of our listening to and understanding the needs and desires of our clients during the past two (2) decades. While each homeowner will have different goals and concerns, below are some of the more common questions we have been asked over the years.
Should we build a new home or renovate our
existing home? What are the primary factors of New Construction vs.
Custom Renovation?
Since each home (and homeowner) is different, there
is no simple answer without a consultation. However, consider the
following benefits for new home construction: Building new is a great
option due to many factors which include:
* Your new home will be built pursuant to the most recent hurricane
standards, making your new home safer in a storm.
• Your new home will qualify for certain insurance discounts because
it will be built at or above the most recent standards..
• Your flood insurance will be minimal since your new home will be
built at or above the most updated requisite flood-zone height.
• The cost of new home construction per square foot is less than the
cost of renovating per square foot.
On the other hand, the following factors should be considered with
respect to custom renovation:
• You love your current home, but want to add space or modify
existing areas.
• You may be able to preserve the “save our homes” tax benefit on the
existing portion of your home.
Should we hire an Architect and Builder
separately or a combined Builder/Design Firm?
There are several benefits to maintaining a separate
architect and builder. First, an independent architect is trained,
experienced, and dedicated to only designing homes, which should result
in a better production of the client’s vision. Maintaining the
separation between architect and builder also allows the client to
accept bids from different builders while considering each builder’s
particular strengths. Moreover, an independent architect and builder can
oversee each other to the client’s benefit since they are not
financially tied to each other. Furthermore, an architect who is
connected to a builder may design a project while considering his
builder’s preferences rather than focusing exclusively on the client’s
goals.
What is a “Cost Plus Contract” and how is it
different from a “Fixed Price Contract?”
A “cost plus contract” is a contract in which the
client pays the actual costs of the project, plus a builder percentage
for overhead and profit. In this type of contract, the client sees every
invoice that is paid during construction.
A “fixed price contract ” is a contract in which the
builder submits a specific bid for the project based on the
specifications provided. The “fixed price” remains constant aside from
changes or additions requested by the client.
For new home construction, our clients may choose either a “cost
plus” or “fixed price” contract.
For custom renovations, we offer only “cost plus”
contracts due to the unpredictability of the costs during the
renovation.
How can I be sure I receive a Competitive Bid?
First, we recommend that you consult several
different builders before selecting the one that is most qualified for
your specific project and goals. A qualified builder should provide you
with a detailed bid based on specific construction documents along with
your personal specifications.
At Bright Bay, Paul A. Haggar personally prepares
each bid for our clients. By collecting detailed estimates from our list
of reliable subcontractors and suppliers, we are able to submit detailed
and accurate quotes to our clients. Additionally, we request estimates
from several different subcontractors and suppliers before finalizing
our bid, so that we ensure the best possible price for the quality
materials we require for our projects.
Lastly, a builder should provide a detailed bid based
on the construction documents provided along with any personal
specifications you have provided.
What is FEMA & the 50% Rule?
FEMA is the Federal Emergency Management Association,
and it passed the so-called “50% Rule” which can affect renovation
projects in flood zones. This rule can be important since many areas of
Pinellas and Hillsborough Counties are flood zones.
Essentially, the “50% Rule” states that if your home
is in a flood zone, and it does not meet the current mandated height,
any renovation is limited to a cost equal to or lesser than 50% of the
value of the structure. As an example: The combined value of your
structure & property is at $800,000. With a breakdown of the structure
value at $600,000 and the land value at $200,000, the renovation would
be limited to $300,000.
It is important to note that each municipality
interprets the 50% Rule differently. Moreover, the proper calculation of
your home’s value is extremely important for any proposed renovation. At
Bright Bay, we have been able to obtain many FEMA permits in the past,
and have the expertise to help our clients deal with the 50% Rule.
For additional information on the 50% Rule, please check the
following links:
www.fema.gov
www.stpete.org/pdf/femasubimpr.pdf
Are there any zoning limitations on the
design or size of the home we want to build?
Each municipality has its own zoning ordinances. A
survey of your property will need to be reviewed by your local building
department to determine how the zoning rules can affect your
construction project. |